Individual Event Report
Event #395 - Summary, and parameter estimates with source IDs |
Known only from a WPPSS listing of events. |
TIME |
LOCATION |
MAGNITUDE |
MAX. INTENSITY |
FELT AREA |
YR |
MO |
DAY |
HR |
MIN |
AM/PM |
Time Type |
LAT(N) |
LON(W) |
DEP (km) |
MAG |
Mag Type |
Felt Plc. |
Felt St. |
Inten- sity |
Int. Type |
Felt Area |
Felt Area Int. |
Felt Area Units |
1906 |
11 |
16 |
|
|
|
|
|
|
|
|
|
Chelan |
WA |
|
|
|
|
|
WPPSS - 2373 |
- |
- |
- |
WPPSS - 2373 |
- |
Underlying Source Material
Source ID |
Publication |
Pub Date |
Pub Details |
2373 |
Washington Public Power Supply System, Preliminary Safety Analysis Report, Ammendment 23, WPPSS Nuclear Project No. 1, 1300 MW Nuclear Power Plant, Vol. 2A. |
1977 |
Table 2R E-9 |
Transcription: 1906 Nov 16 Chelan, Wash. |
|
| | |