This material is extracted from Washington Public Power Supply System, Preliminary Safety Analysis Report, WPPSS Nuclear Project No. 1, 1300 MW Nuclear Power Plant, Vol. 2A. Vol, 2A has a submittal letter dated September 19, 1977. We have copy number 82. The letter states that Amendment 23 is the response of WPPSS to a request to re-evaluate the 1872 earthquake.

Vol. 2A contains the following:

Scanned Items include: