Individual Event Report
 
| Event #395 - Summary, and parameter estimates with source IDs                                             | 
 
| Known only from a WPPSS listing of events. | 
 
| TIME | 
LOCATION | 
MAGNITUDE | 
MAX. INTENSITY | 
FELT AREA | 
 
| YR | 
MO | 
DAY | 
HR | 
MIN | 
AM/PM | 
Time Type | 
LAT(N) | 
LON(W) | 
DEP (km) | 
MAG | 
Mag Type | 
Felt Plc. | 
Felt St. | 
Inten- sity | 
Int. Type | 
Felt Area | 
Felt Area Int. | 
Felt Area Units | 
 
| 1906  | 
11  | 
16  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
Chelan  | 
WA  | 
  | 
  | 
  | 
  | 
  | 
 
| WPPSS - 2373 | 
 -  | 
 -  | 
 -  | 
WPPSS - 2373 | 
 -  |  
 
 Underlying Source Material
| Source ID | 
Publication | 
Pub Date | 
Pub Details | 
 
| 2373  | 
Washington Public Power Supply System, Preliminary Safety Analysis Report, Ammendment 23, WPPSS Nuclear Project No. 1, 1300 MW Nuclear Power Plant, Vol. 2A.  | 
1977  | 
Table 2R E-9  | 
 
| Transcription:     1906  Nov     16  Chelan,  Wash. | 
 
|   | 
 
 
 
 
 
 
   |    |    |