Individual Event Report
 
| Event #373 - Summary, and parameter estimates with source IDs                                             | 
 
| Information from Woodward-Clyde catalog and WPPSS. | 
 
| TIME | 
LOCATION | 
MAGNITUDE | 
MAX. INTENSITY | 
FELT AREA | 
 
| YR | 
MO | 
DAY | 
HR | 
MIN | 
AM/PM | 
Time Type | 
LAT(N) | 
LON(W) | 
DEP (km) | 
MAG | 
Mag Type | 
Felt Plc. | 
Felt St. | 
Inten- sity | 
Int. Type | 
Felt Area | 
Felt Area Int. | 
Felt Area Units | 
 
| 1905  | 
12  | 
  | 
2  | 
  | 
A  | 
  | 
47.80  | 
120.00  | 
  | 
  | 
  | 
Chelan  | 
WA  | 
  | 
  | 
  | 
  | 
  | 
 
| WPPSS - 2446 | 
WWC - 1755 | 
 -  | 
 -  | 
WPPSS - 2446 | 
 -  |  
 
 Underlying Source Material
| Source ID | 
Publication | 
Pub Date | 
Pub Details | 
 
| 1755  | 
Woodward Clyde Consultants,  unpublished  | 
1981  | 
Woodward-Clyde Consultants (1981), Historical Catalog (1841-1980) for the Pacific Northwest Region, unpublished catalog prepared for the Washington Public Power Supply System.  Copy provided to UW in 1993.  | 
 
| Transcription: 190512  02      47800-120000W                    WG   01 | 
 
|   | 
 
| Source ID | 
Publication | 
Pub Date | 
Pub Details | 
 
| 2372  | 
Washington Public Power Supply System, Preliminary Safety Analysis Report, Ammendment 23, WPPSS Nuclear Project No. 1, 1300 MW Nuclear Power Plant, Vol. 2A.  | 
1977  | 
Table 2R E-9  | 
 
| Transcription:   1905  Dec         Chelan,  Wash. | 
 
|   | 
 
| Source ID | 
Publication | 
Pub Date | 
Pub Details | 
 
| 2446  | 
Washington Public Power Supply System, "WPPSS Nuclear Project No. 2, Final Safety Analysis Report, Volume 1, Amendment 18" September 1981  | 
1981  | 
Table 2.5-6  | 
 
Transcription: 1905  Dec         Chelan,     Wash.           2:  am. date                WG-4
                                                     uncertain,
                                                     1 or 2 Dec. | 
 
|   | 
 
 
 
 
 
 
   |    |    |